Welcome

Welcome to the OCP Door Heat Exchanger Sub-Project.

This Project is open to the public and we welcome all those who would like to be involved.

The Door Heat Exchanger (DHX) Sub-Project is a critical component of the Open Compute Project's (OCP) broader effort to standardize advanced cooling solutions in data centers, particularly in high-performance computing environments. This sub-project focuses on the development, integration, and standardization of Rear Door Heat Exchangers (RDHX) within the ORV3 (Open Rack Version 3) framework. RDHX systems are designed to enhance cooling efficiency by utilizing liquid cooling technology to manage the thermal load of high-density IT equipment, thereby improving energy efficiency and operational reliability in modern data centers.

The ongoing work in this project involves collaboration between key industry players . These organizations are working together to address various challenges associated with RDHX implementation, including the development of standardized interfaces, ensuring compatibility with existing data center infrastructure, and mitigating risks such as fluid leaks and equipment failure. The project aims to produce comprehensive guidelines and specifications that will be shared through white papers and industry presentations, helping to drive the adoption of RDHX systems across the industry.


Summary of Current Workstreams

1. RDHX Interfaces for ORV3:

This workstream focuses on defining the mechanical, fluid, and electrical interfaces required for integrating RDHX systems with ORV3 racks. The effort addresses challenges such as ensuring compatibility with existing rack designs, preventing fluid leaks, and maintaining system reliability. The outcomes of this workstream include the standardization of interfaces to support various configurations, including hybrid systems that combine liquid and air cooling.

2. Aluminum Heat Exchanger Integration:

Led by a collaboration between OVHCloud, Meta, and Valeo, this workstream aims to overcome the challenges associated with using aluminum in heat exchangers, particularly the risk of corrosion. The team is developing standards for internal linings, coatings, and compatible coolants to enhance the performance and durability of aluminum heat exchangers in data center environments. This workstream will produce guidelines that address integration techniques, testing methodologies, and recommendations for widespread adoption.

3. Air-Assisted Liquid Cooling (AALC) with Sidecar Cooling:

This workstream explores the implementation of Air-Assisted Liquid Cooling (AALC) systems, which combine the efficiency of liquid cooling with the simplicity of air cooling. The focus is on developing sidecar units that attach to or are positioned adjacent to the IT racks, providing flexible and scalable cooling solutions without the need for access to facility water. The team is working on standardizing performance metrics, interface designs, and ensuring the maintainability and reliability of these systems in various data center configurations.

Scope

The scope of the Door Heat Exchanger Sub-Project is focused on several key areas that are essential for the successful deployment and integration of RDHX systems within data centers. These include:

In-Scope Activities:

Fluid Characteristics and Compatibility: Defining the types of fluids and their properties that are suitable for use in RDHX systems, ensuring compatibility with existing data center cooling infrastructure and optimizing heat transfer efficiency. Operational Parameters: Establishing guidelines for the operating conditions of RDHX systems, including temperature ranges, flow rates, and pressure levels, to ensure reliable performance across various data center environments. Heat Extraction Metrics: Developing standardized methods for measuring the effectiveness of RDHX systems in extracting heat, which is critical for assessing system performance and energy efficiency. System Integration: Creating solutions that allow RDHX systems to be integrated seamlessly into both traditional and modern data center environments, whether they use air cooling, liquid cooling, or a combination of both (hybrid systems). Interface Standardization: Standardizing the mechanical, fluid, and electrical interfaces required for RDHX systems to function effectively with ORV3 racks and other components, facilitating easier deployment and maintenance.

Out-of-Scope Activities:

This project does not cover detailed installation methods for cold plates or the broader definitions of data center facility loops beyond the direct rack interfaces. The focus remains on rack-level integration and the specific challenges related to RDHX systems. This sub-project is crucial for advancing the adoption of liquid cooling technologies within the data center industry. By focusing on standardization and the development of robust guidelines, the project aims to ensure that RDHX systems are not only effective but also widely compatible with various data center configurations, supporting the industry's move towards more sustainable and efficient cooling solutions.

Disclaimer: Please do not submit any confidential information to the Project Community. All presentation materials, proposals, meeting minutes and/or supporting documents are published by OCP and are open to the public in accordance to OCP's Bylaws and IP Policy. This can be found on the OCP OCP Policies page. If you have any questions please contact OCP.

Project Leadership

Rack & Power Project Incubation Committee Representative

Rack & Power Project Leads

Door Heat Exchanger Workstream Leads

Documents

- ACS Charter
- Meeting Minutes (Working Doc)
- OCP Presentation Template - please contact Michael Schill for a copy

ACS Door Heat Exchanger Workstream Work in Progress Documents

- ACS Door HEX Options Presentation
- High-Power GPU Rack Concept presentation
- Working OCP Specification
- ACS Door Heat Exchanger Requirements Document for Open Rack Revision .95

Get Involved

If you would like to get more involved in the project, please sign-up on the mailing list. This is the primary method that we use to communicate project status, meeting schedules, and agendas.

- ACS Mailing List
- ACS Door Heat Exchanger Mailing List

Regular Project Calls

Every other Thursday from 12-1pm ET

Call link

- Link to ACS Door Heat Exchanger Workstream Calls

You can also dial in using your phone. United States (Toll Free): 1 866 899 4679 United States: +1 (669) 224-3318 Access Code: 600-541-373


Recordings from Past Calls

Door Heat Exchanger

- Nov 07, 2024
- Oct 03, 2024
- Aug 01, 2024
- June 6, 2024
- May 9, 2024
- March 28, 2024
- February 29, 2024
- February 15, 2024
- February 2, 2024
- January 18, 2024
- January 4, 2024
- December 7, 2023
- November 9, 2023
- October 27, 2023
- September 28, 2023
- September 14, 2023
- August 17, 2023
- July 20, 2023
- July 6, 2023
- June 22, 2023
- May 25, 2023
- May 11, 2023
- April 27, 2023
- March 30, 2023
- March 2, 2023
- February 2, 2023
- January 19, 2023
- November 10th, 2022
- October 23rd, 2022
- October 16th, 2022
- September 22nd, 2022
- September 15th, 2022
- August 4th, 2022
- July 7th, 2022
- June 9th, 2022
- May 12th, 2022
- April 14th, 2022
- March 31st, 2022
- March 17th, 2022
- February 17th, 2022
- January 20th, 2022
- December 9th, 2021
- October 28th, 2021
- October 14th, 2021
- September 17th, 2021
- July 22nd, 2021
- July 8th, 2021
- May 27th, 2021
- May 13th, 2021
- April 29th, 2021
- April 15th, 2021
- February 18th, 2021
- February 4th, 2021
- Janaury 21st, 2021
- December 10th, 2020
- October 29th, 2020
- October 15th, 2020
- September 17th, 2020
- August 20th, 2020
- May 28th, 2020
- April 2nd, 2020
- March 5th, 2020
- October 17th, 2019
- August 22nd, 2019
- May 2nd, 2019
- March 7th, 2019
- February 7th, 2019
- January 24th, 2019
- December 13th, 2018
- November 29th, 2018
- November 1st, 2018
- October 18th, 2018
- Notes from Oct 18 Call

ACS Kickoff Calls

- September 19th, 2018
- September 5th, 2018
- August 15th, 2018